Labour Information Management System
Computers and accessories supplied, configured and commissioned for the national labour information platform.
BDT 3,684,998
Dec 2023
Donor-funded
LIMS — development / donor-funded
Donor-funded equipment packages fail on the unglamorous details: wrong specification for the operating environment, no warranty pass-through, and weeks lost configuring machines on site.
Equipment was specified against the project’s technical requirement and its actual operating environment, procured through authorised channels with full warranty pass-through, then configured and imaged before despatch so on-site commissioning time collapsed.
- 01SpecificationEquipment specified against project requirement and operating environment.
- 02Authorised procurementProcured through authorised channel distribution with full warranty pass-through.
- 03Pre-configurationConfigured and imaged before despatch to reduce on-site commissioning time.
- 04Distributed deliveryDelivery and installation coordinated with project administration.
BDT 3,684,998
31 Dec 2023
Work order executed
National labour information system